Jl. Mayjend Sungkono No. 38, Kebomas, Gresik Site Office: +62 31 9900 7788 Marketing: +62 31 9934 2220
Phase 2 Type D Available • Phase 1 Sold Out
ID EN

5 Crucial Factors When Selecting a Warehouse in Gresik–Surabaya

A practical checklist for logistics directors, manufacturers, and industrial property investors entering East Java.

Strategic warehouse estate in Gresik Surabaya corridor at Akses Kebomas

Before acquiring or leasing a warehouse in the Gresik–West Surabaya industrial corridor, supply chain teams need to inspect fundamentals beyond headline price per square meter. Location geometry, truck access, zoning compliance, and sub-soil stability directly shape daily operating expenses for years.

1. Immediate Proximity to Toll Gates & Distribution Hubs

Every extra kilometer away from the expressway network adds daily fuel burn and fleet turnaround delays. Situated on Jl. Mayjend Sungkono No. 38, Akses Kebomas lies just 4 km from Romokalisari Toll Gate and 6 km from Kebomas Toll Gate, directly adjacent to KIG (Kawasan Industri Gresik), Margomulyo, Kalianak, and Tambak Langon.

2. Rapid Access to East Java Container Ports

For export-import operators and inter-island distributors, port drayage time can dominate logistics costs. Operating from the Gresik–West Surabaya corridor provides efficient truck access to Teluk Lamong Port (9 km), Tanjung Perak Port (21 km), and JIIPE Manyar Deep-Sea Port (24 km).

3. Main Estate Road Width (20m ROW) & Shared Logistics Facilities

Low-cost warehouses frequently sit on narrow roads where 40-foot containers struggle to maneuver. Verify that the industrial estate features a minimum 20-meter ROW road, dedicated parking bays, an on-site weighbridge, and communal loading docks to prevent gate congestion.

4. HGB Land Title & Approved Zoning Flexibility

Ensure the underlying land title (SHGB) and regional zoning legally authorize your planned business operations — whether pure distribution warehousing or clean non-polluting (Non-3B) manufacturing.

5. Sub-Soil Stability & Industrial Concrete Floor Specification

Avoid reclaimed swamp or fishpond land prone to long-term uneven sinking. Prioritize estates constructed on compacted ex-hill ground paired with a 15 cm concrete floor slab and floor hardener capable of supporting heavy pallet racking and continuous forklift traffic.

Ready to Inspect the Estate in Person?

Review Phase 2 Type D technical specifications or book a site tour with PT. Kebomas Makmur.

Schedule Site Visit